1. Bukit Asam
2.Cilacap
3.Tarahan
- buka:
Location: South Sumatra
Operator: PT PLN
Configuration: 4 X 65 MW
Operation: 1989-1995
Fuel: subbituminous coal, oil
Boiler supplier: Stein
T/G supplier: Rateau, GEC-Alsthom
EPC: Sogeah, Japan Jurong Engineering
- penampakan:
2.Cilacap
- buka:
- Location: Central Java
Operator: PT Indonesia Power
Configuration: 2 X 300 MW
Operation: 2006
Fuel: subbituminous coal
Boiler supplier: Dongfang
T/G supplier: Dongfang
- buka:
3.Tarahan
- buka:
Lokasi : Lampung Selatan
Operator : PLN
Kapasitas Daya : 2x100 MW
- buka: